Uzbekistan 1000t/d cement production line

Project Party A xixiang great wall machinery
Project Area Uzbekistan
Core Equipment material vertical mill,rotary kiln
Annual Output 1000t/d

Overview

They have done many surveys in China in the early stage of the project and were attracted by the first-class technology, equipment and services of Xinxiang Great Wall and finally signed the contract of 1000 t d cement production line project with Xinxiang Great Wall

Configuration

Main equipment: GRMR26.21 raw material vertical mill, 3.2x60m rotary kiln, GRMS33.31 cement vertical mill, GRMK16.21 coal vertical mill

Production time: Estimated (time)

Analysis

The project is the key project of the Great Wall company under “One Belt One Road”. The owner is a well-known enterprise in Uzbekistan. They have done many surveys in China in the early stage of the project and were attracted by the first-class technology, equipment and services of Xinxiang Great Wall and finally signed the contract of 1000 t/d cement production line project with Xinxiang Great Wall. At present, all the equipment for the project has been delivered and the construction is under way.