Industry Reports

Professional slag Turnkey grinding plant/ggbfs grinding plant

  • By
  • Aug 24, 2017  UTC+8
  • Views:
  • Tags: slag Turnkey grinding plant ggbfs grinding plant

GGBFS Turnkey plant (slag grinding plant) supplier, CHAENG have good reputation among customers. We are not only to do best on the quality of auxiliary machine, like dust collector, reducer etc.to guarantee the stable operation, but also insist on the business concept of “satisfaction of customers is our eternal pursuit” to provide one-station solution from pre-sales to after-sale

Features

1.A good return on investment, can recover the cost effective

With the application widely of mineral powder, the domestic market demand increase rapidly in this project. Investment powder production line with considerable economic benefit and high return on investment, usually 1-3 years can recover the cost.

2.High efficiency, energy saving, environmentally friendly

GRMS series slag vertical mill can reduce power consumption effectively in the process of production as the core equipment of production line. Meanwhile, mill internal is negative pressure in process, which produces almost no dust during operation, lower noise and pollution than traditional tube mill.

3.Mature general contrasting scheme

CHAENG has the domestic first-class technical team, and combined with domestic chief vertical expert for technology. Great Wall Machinery can design detail general scheme according to customer's actual situation, and can provide "turnkey service" from civil engineering to production operation.

4.The customers cases witness all over the country

Great Wall Machinery GGBS (Granulated Blast-furnace Slag)Grinding Plant has been recognized by key customers, the domestic production operation of the production line has been up to more than 30, customers all over the country

slag vertical mill parts

Grinding rollers, rocker arms, grinding table and other spare parts in the whole system are manufactured by CHAENG originally, ensuring the quality and greatly reducing the customer's worries of no where to find the spare parts.
\

Chaeng service

1. Pre-sales Service

After knowing about customer’s need, we provide flow sheet and offer within 48 hours for customers.

2. In-sale Service

We guarantee that all the equipment will be delivered within 6 months after signed contract and received deposit. During production, you are welcomed to supervise and examine goods. If required, we provide solution of packing and transportation within 7 days before shipment.

3. After-sale Service

When the equipment shipped to customer site, we provide two technicians to guide installation, debugging and operation.
 


info@chaeng.co +8615638871509